Coquitlam, BC
Homepage
Go to Site Search

News Flash

Attend November 20 Info Session and Take Survey on Pipeline Road Improvements South of Guildford

The City is planning to improve safety and accessibility for people walking, biking and driving along Pipeline Road between Guildford Way and Lincoln Avenue with a new street design that will include a protected micromobility lane.

City News Posted on November 07, 2024

COQUITLAM, B.C., November 7, 2024 – The City is planning to improve safety and accessibility for people walking, biking and driving along Pipeline Road between Guildford Way and Lincoln Avenue with a new street design that will include a protected micromobility lane. Community members are encouraged to share feedback that will help shape the final upgrade plans for the corridor through upcoming engagement opportunities. 

Planned Changes to the Road

Pipeline Road is an important transportation corridor, connecting key destinations within the City Centre area. To reduce risks and improve safety and access for all road users, the following changes are planned:

  • Construction of a new two-way micromobility lane separated from vehicle traffic by concrete curbs, suitable for people of all ages and abilities
  • Road safety and accessibility improvements, including new turn signals, signal operation changes, separated turn lanes and more crosswalks along the corridor
  • Changes to parking and loading zones, including new time restrictions for some on-street parking and the creation of loading zones for school drop-off/pick-up and delivery vehicles 

Construction is planned for the summer of 2025 in order to occur at the same time as the scheduled road repaving on Pipeline Road between Guildford Way and Inlet Street. Learn more about the project, including maps and drawings of the planned changes online at LetsTalkCoquitlam.ca/Pipeline.  

Learn More and Provide Input

Residents, visitors and frequent users of this area of Pipeline Road are encouraged to share their thoughts on the project plans and help shape the final design. Attend the drop-in information session and share your thoughts via the online survey. 

  • Information Session: Wednesday, November 20, 5:30 – 7:30 p.m. at Glen Elementary Gym, 3064 Glen Drive (Children’s colouring table will be available, parent supervision required.)
  • Online Survey: Open November 12 to December 3 at LetsTalkCoquitlam.ca/Pipeline

Next Steps

Input received via the survey and information session will be considered alongside transportation design best practices, the City’s strategic plans, and other factors to inform the final design, which will be presented to Council in early 2025. Construction is anticipated to begin in summer 2025.

What Else is Happening Along Pipeline Road
 The following are part of long-term projects that will bring infrastructure and safety improvements for residents and all road users: 

Media contact:
Thomas Thivener
Manager Transportation Planning
604-927-4322
CCActiveTransportation@coquitlam.ca

We acknowledge with gratitude and respect that the name Coquitlam was derived from the hən̓q̓əmin̓əm̓ (HUN-kuh-MEE-num) word kʷikʷəƛ̓əm (kwee-KWET-lum) meaning “Red Fish Up the River”. The City is honoured to be located on the kʷikʷəƛ̓əm traditional and ancestral lands, including those parts that were historically shared with the q̓ic̓əy̓ (kat-zee), and other Coast Salish Peoples.


Contact Us

  1. 3000 Guildford Way

    Coquitlam, BC Canada V3B 7N2

    Map to City Hall


    Hours: Mon to Fri, 8 a.m.-5 p.m.

    Reception: 604-927-3000

Arrow Left Arrow Right
Slideshow Left Arrow Slideshow Right Arrow