When is a building or plumbing permit required?
  • Construction of a new building
  • Addition to existing building
  • Addition of attached garages
  • Building a new secondary suite or legalizing an existing secondary suite
  • Upgrading an existing building or changing its use
  • Creating new rooms or spaces within existing building
  • Finishing a basement
  • Demolishing a building or part of a building
  • Building a deck or gazebo
  • Installation of a hot tub (PDF)
  • Construction of a swimming pool (PDF)
  • Adding an accessory building, equipment room, shed, or detached garage over 10m2
  • Building a retaining wall over 1.2 metres in height
  • Constructing roads within a strata development
  • Restoration, maintenance or repair of building’s structural components and systems
  • Restoration, maintenance or repair of significant building fire and life safety components and systems
  • Storage tanks (PDF)

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.