Providing housing choice is important to address the range of housing needs in Coquitlam. Since 2011, the Housing Choices program in Southwest Coquitlam has encouraged diverse housing options through infill development. The program, now referred to as Small-Scale Housing, has been expanded, with ground-oriented, multi-unit housing options permitted in most low-density residential areas across the city.
Small-Scale Housing can take many shapes and forms, including single-detached dwellings, accessory dwelling units such as secondary suites, backyard suites, duplexes, triplexes, fourplexes and multiplexes. The City defines all of these housing types as Small-Scale Residential in the Zoning Bylaw.
Small-Scale Residential is permitted under the following zones in the Zoning Bylaw:
This webpage provides information for property owners interested in developing small-scale housing and helps determine whether your property qualifies for small-scale, multi-unit housing.
Check your property's zoning and land use designation using QtheMap
1. Go to Q the Map
2. Enter the property address in the search bar.
3. Select the "Layers List" on the bottom of the page
4. Select the "Planning and Development" layer and ensure the "Zoning" layer is selected.
5. Select the ""Schedule B - Land Use" layer.
If your property is zoned for small-scale residential:
If your property is not zoned for small-scale residential:
Note: If you are proposing to subdivide your property that is zoned for Small-Scale Residential, each lot must comply with the lot size requirements in the Zoning Bylaw. Check the Zoning Bylaw for the requirements that apply to your property.
Additional Development Considerations
If any of the following apply to your property, there may be additional considerations or requirements for development. Contact Development Services staff for more information.
1. The existing house on my property was built before 1945.
2. There is a creek on, or next to, my property.
3. There is a steep slope on, or next to, my property.
4. The property has an area of 280 m² or less.
5. If the property is shown in the yellow or red zone of the SSMUH Available Fire Flow Map
Before you can apply for a Building Permit to build Small-Scale Housing you need to receive a number of approvals from the City.
You may also need:
More information is available on the Development Applications page, Builder Resources page or in our Development Permit Application Guide (PDF), which outlines the process for obtaining a Development Permit.
You will need to hire professionals to help you as part of your project team to work with you on different pieces of your application. We have included links to websites of professional organizations, where possible. This is a high level list of some of the professionals you may require, and examples of work they can provide.
Building Designer or Architect
Qualified Environmental Professional (QEP)
Qualified Tree Expert (QTE)
Fire Flows – Ensuring Enough Water for Fire Protection
Whenever new Small-Scale Housing is built, Coquitlam needs to make sure there's enough water available for firefighters in case of an emergency. This is known as fire flow – the amount of water needed to control or put out a fire, at the right pressure.
To keep people safe while supporting new Small-Scale Housing:
Please make sure to complete and send the Small-Scale Residential Fire Flow Requirements Form (PDF) with your building permit application.
For more general information about water and fire flow in your area, check out the City’s Available Fire Flow Map.
Stormwater Management
Coquitlam uses an integrated stormwater management approach to manage rainwater that runs off rooftops, driveways and other hard surfaces to prevent flooding, protect property and keep local creeks and ecosystems healthy. Coquitlam has implemented new policy for stormwater management in small scale residential developments to mitigate the impacts of densification.
For more information please visit our Small-Scale Residential Stormwater Management webpage.
Landscape Designer or Landscape Architect
Coordinating Registered Professional (CRP)
A CRP (may be an architect or an engineer) is required at the time of Building Permit application for a triplex or fourplex to coordinate all professionals working on the development and to sign-off on the required BC Building Code Schedules stating that the work has been completed to conform to the approved Development Permit.
It is important that you talk to professionals about creating a budget for your Small-Scale Housing project. There may be other costs associated with your development that are not outlined here, and you will need to ensure you have created an appropriate project budget.
Aside from the hiring of professionals required to complete your applications, and the construction crews required to work on the development, here are some (but not all) of the items that have financial implications. These fees, charges, and securities are required at different times during your development process and City staff will be able to let you know when these would be payable, and which would be applicable to your project.
Application Fees are associated with:
All new developments contribute to upgrading adjacent streetscapes to a modern urban standard, including curbs, gutters, sidewalks, lighting, landscaping and rear lane improvements. These upgraded street works are called “Frontage Works”. You will be required to either pay into the Frontage Works Program (staff will confirm if you’re eligible through the application process) or construct the Frontage Works as part of your project. Your Civil Engineer can provide you with a cost estimate for these works. The Engineering & Public Works Fees and Charges listing in Schedule F of the Fees and Charges Bylaw (PDF) can be helpful to estimate the costs. Costs may be associated with the following:
Refundable securities will need to be provided to the City to complete specific works. Some of these securities may include:
These deposits are refunded once City staff are satisfied that the work has been completed and maintained after a set period of time.
Before a Building Permit is issued, City Amenity Cost Charge (ACC) payments are due. ACCs help pay for amenities including community centres, recreation facilities and libraries, which are needed to serve the community due to growth.
Before a Building Permit is issued, City Development Cost Charge (DCC) payments are due. DCCs help pay for transportation, water, sewer, drainage, park acquisition and some park development projects which are needed to serve the community due to growth.
In addition to the City’s DCCs, other agencies have development charges that we collect on their behalf at the time of issuing a Building Permit. These charges are subject to change and may increase during the time you are in application with the City. Check with Development Planning to confirm the rates which would be in effect.
Links to information on these various charges are listed below can be found at the City’s Fees and Charges page:
In addition to the designing your project to meet the Design Guidelines as part of your Development Permit Application package, your project must meet all other City Bylaw requirements, including the requirements set out in the Zoning Bylaw.
Some helpful Zoning Bylaw links include:
Other considerations:
The building and site improvements proposed for your property should not impact your neighbour’s property. We would prefer your project be designed with no retaining walls, however, minimum stepped retaining is allowed (see the Zoning Bylaw, Maximum Retaining Wall Height Section 516 (PDF)).
All submitted plans should show the existing and proposed elevations, at all changes in grade, and the existing elevations at least 1 metre beyond the property lines of the site proposed to be developed.
Garbage and green waste carts and must be stored in a garage or in a structure that is fully enclosed (with a roof) in order to be wildlife resistant. Enclosures must be designed so that there are no gaps which may give entry to wildlife (for example, no lattice). Each triplex or fourplex unit will be provided one 240L size cart for organic waste, one 240L size cart for garbage, a blue recycling box, and a glass recycling box.
You should discuss your hydro requirements with BC Hydro. If there is a requirement from BC Hydro to install a Local Pad Transformer (LPT), the City prefers it to be located away from the front of the building and screened with appropriate landscaping. An electrical room may also be required in the building design.
The Good Neighbour Development Policy formalizes a notification process for developers to contact and inform neighbours about the development and construction work that will be taking place at a property. Please review this Good Neighbour Development Policy (PDF) and ensure that you understand what this means for you as a developer. A declaration will be necessary before the City will issue a Building Permit or Demolition Permit.